- This three-phase project included two new deep-water shipping berths and multiple 12-inch diameter piping systems to receive petroleum products and ammonia.
- The new facility allows three different users to dock and unload cargo simultaneously.
- Project scope included the demolition, clean-up excavation, and dredging of the existing 900-foot REK Finger Pier.