Location:
Tampa, FL
Owner:Port Tampa Bay |Tampa, FL
Architect:
CH2M Hill, Inc. | Palm Beach Gardens, FL

Port Tampa Bay Petroleum Facilities Improvements

  • This three-phase project included two new deep-water shipping berths and multiple 12-inch diameter piping systems to receive petroleum products and ammonia.
  • The new facility allows three different users to dock and unload cargo simultaneously.
  • Project scope included the demolition, clean-up excavation, and dredging of the existing 900-foot REK Finger Pier.